Minor update to align language in the tariff to the BPM in regards to bidding requirements for pumping load. Previously, section 7.1.1 in the BPM created one standard bidding rule for use limited resources. However, for pumping load, tariff section 40.6.4.2 sets no RUC bidding requirement for pumping load, use limited or not. This revision will apply the same bidding requirements for pumping load whether it is use limited, or not.