PRR Details
PRR #
1522
Title Documentation only updates to the real time energy quantity pre-calculation and metered energy adjustment factor pre-calculation for the BAResBaseScheduleEnergy variable.
Date Submitted 7/27/2023 10:26 AM
PRR Category A
Priority Normal
Owner Ahmadi, Massih (CAISO)
Status Closed
Status End Date 10/17/2023 11:59 PM
Related BPM Settlements and Billing
BPM Section RT Energy Quantity PC v.5.24.0a; Metered Energy Adjustment Factor PC v.5.16.0a
RSS Subscribe
Existing Language
 

See BPMs attached to this PRR

Proposed Language
 

See BPMs attached to this PRR

Reason For Revision
A participant dispute uncovered an issue in which pumped storage hydro resources located in the WEIM balancing authority area were being incorrectly designated as generating resources during intervals in which those resources were pumping as loads, as indicated by those resources having a negative base schedule.  The code fix upstream to settlements will ensure that the input designates pumped storage hydro resources in the WEIM balancing authority area as load resources when they are in pumping mode.

 

The BPM configuration guides RT Energy Quantity PC v.5.24.0a and Metered Energy Adjustment Factor PC v.5.16.0a have been updated to reflect a revised definition for the BAResBaseScheduleEnergy variable. The updated description reflects that the data will be under resource type = “LOAD” during intervals in which a pumped storage hydro resource located in the WEIM Balancing Authority Area has a negative base schedule.

 

The upstream changes are to be deployed around 7/31/2023.  The effective date of those changes will align to the BPM effective date of 4/1/2023.

Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Ahmadi, Massih (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

​Approve as original submitted.

Identification of the authorship of comments

N/A
Action

Approve the BPM PRR as submitted

Approve as original submitted.
Statement of apparent requirements of the BPM PRR

N/A
Priority and rank for any BPM PRR requiring a CAISO system change

Proposed effective date(s) of the BPM PRR

Other recommended actions

Click here to view the Final Decision for this PRR
Final Decision

The ISO will adopt the BPM change as proposed in the recommendation plus the additional content revisions proposed during the comment on recommendation period.
Stakeholder Comment

No comments submitted

Effective Date

4/1/2023
Action

Adopt the recommendation as modified

Announcements
The change to 3/1/23 Start Date has to do with impact analysis CAISO provided for all the WEIM Pump Storage resources.
Posted On - 9/13/2023 10:23 AM
Changed Effective Start Date on both BPMs from 4/1/23 to 3/1/23.
Posted On - 9/12/2023 10:46 AM
Impact Analysis
Impact Analysis Form.doc    
Notes:
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
No Recommendation Comments available for this PRR.
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.