Proposed Revision Request Detail Help
PRR Life Cycle*********Closed
PRR Details
PRR #
1493
Title Updated BPM configuration guide for charge group pre-calculation system resource deemed delivered energy quantity to accommodate logical meter calculator scenarios where the electronic tag is curtailed mid-hour
Date Submitted 3/28/2023 10:30 AM
PRR Category B
Priority Normal
Owner Ahmadi, Massih (CAISO)
Status Closed
Status End Date 7/19/2023 11:59 PM
Related BPM Settlements and Billing
BPM Section CG PC System Resource Deemed Delivered Energy Quantity
RSS Subscribe
Existing Language
See BPM attached to this PRR
Proposed Language
See BPM attached to this PRR
Reason For Revision
The current Logical Meter Calculator (LMC) in System Resource Deemed Delivered Pre-Calculation (PC) is not capturing scenarios when the E-tag is curtailed mid-hour, but the Pi-Tag is non zero. In scenarios where the e-tag is curtailed mid-hour we want to zero out the PI interval values (because energy flow on the e-tag did not occur). Otherwise, it results in the derivation an inaccurate denominator in the allocation factor equation. System Resource Deemed Delivered PC will utilize the existing Checked Out Interchange Shadow Indicator to determine if there is flow on the e-tag which will be signified by the Shadow indicator interval value being set to 1. A null or zero interval value signifies that there was no flow on the tag and as such will result in the PI interval value being zeroed out and as a result no LMC shaping occurs against it. System Resource Deemed Delivered PC is impacted.The effective trade date of the change is 7/1/2023 and the anticipated implementation date is 04/26/2023.
Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Ahmadi, Massih (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

The ISO proposes no modified BPM language beyond that proposed in the BPM PRR.

Identification of the authorship of comments

No comments were received.
Action

Approve the BPM PRR as submitted

N/A
Statement of apparent requirements of the BPM PRR

This BPM PRR contains basic language changes.
Priority and rank for any BPM PRR requiring a CAISO system change

There are system changes associated with this PRR. The system changes are planned for implementation on 7/1/2023 on a normal basis.
Proposed effective date(s) of the BPM PRR

The ISO proposes an effective date of 7/1/2023 for the BPM revisions.
Other recommended actions

The ISO does not recommend any other actions on this BPM PRR.
Click here to view the Final Decision for this PRR
Final Decision

Approve as originally submitted.
Stakeholder Comment

N/A

Effective Date

Action

Adopt the recommendation as originally issued

Announcements
No Announcements has been posted for this PRR.
Impact Analysis
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
No Recommendation Comments available for this PRR.
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.
Attachments