See BPM attached to this PRR
Implementation of Nodal procurement ensures that both energy and flexible ramp awards are transmission feasible. This nodal approach addresses operational concerns that flexible ramping capacity may not be dispatchable and more accurately prices individual resource's flexible ramp capacity. The goal of this initiative is to not eliminate stranded ramping capability when system conditions change.
The scope of the FRP Deliverability is:
Due to these changes settlements need to update the charge codes accordingly. Settlements will now apply the new Flex Ramp Prices in our calculations, Update our Allocation calculations to take in consideration the Pass Group determination of each BAA.
For WEIM changes:
The configuration changes are needed to support settlement of WEIM Gen-Only BAAs. In the absence of metered demand, this update will allow settlements to allocate to an entity by using a new Gen-Only BAA Flag.
The effective Trade Date for this change is 11/1/2022 and the anticipated implementation date is 10/26/2022.
The ISO proposes no modified BPM language beyond that proposed in the BPM PRR