Proposed Revision Request Detail Help
PRR Life Cycle*********Closed
PRR Details
PRR #
1410
Title Update configuration guides to reflect joint-owned units pilot initiative settlement
Date Submitted 2/24/2022 2:28 PM
PRR Category B
Priority Normal
Owner Ahmadi, Massih (CAISO)
Status Closed
Status End Date 5/17/2022 11:59 PM
Related BPM Settlements and Billing
BPM Section The following BPM and its versions are subject to the current PRR:

CG PC Start-Up and Minimum Load Cost v5.19
CG PC Metered Energy Adjustment Factor v5.15
RSS Subscribe
Existing Language
 
See BPM attached to this PRR
Proposed Language
 
See BPM attached to this PRR
Reason For Revision
 

The Settlement configuration changes will support the Joint-Owned Units Pilot project. It will allow the settlement of joint ownership of physical resources by two EIM entities, specifically, the Public Service Company of New Mexico (PNM) and the Tucson Electric Company (TEP).

 

Configuration guides as listed above have been updated for documentation to reflect the changes.

 

The changes are to be deployed around 4/27/2022. The effective date will be Trade Date 5/3/2022.
Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Ahmadi, Massih (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

The ISO proposes no modified BPM language beyond that proposed in the BPM PRR.
Identification of the authorship of comments

No comments were received.
Action

Approve the BPM PRR as submitted

N/A
Statement of apparent requirements of the BPM PRR

This BPM PRR contains basic language changes.
Priority and rank for any BPM PRR requiring a CAISO system change

There are system changes associated with this PRR. The system changes are planned for implementation on 5/27/2022 on a normal basis.
Proposed effective date(s) of the BPM PRR

The ISO proposes an effective date of 5/3/2022 for the BPM revisions.
Other recommended actions

The ISO does not recommend any other actions on this BPM PRR.
Click here to view the Final Decision for this PRR
Final Decision

The ISO will adopt the BPM change as proposed in the recommendation plus the additional content revisions proposed during the comment on recommendation period.
Stakeholder Comment

No comments submitted

Effective Date

5/3/2022
Action

Adopt the recommendation as modified

Announcements
BPM has been replaced.  Reason: To match the BPM for Start-up and Minimum Load Cost Precalc to actual configuration for the RMR changes. Also, to correct a variable name to resolve CIDI ticket #248639.
Posted On - 3/22/2022 4:52 PM
Impact Analysis
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
No Recommendation Comments available for this PRR.
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.