Proposed Revision Request Detail Help
PRR Life Cycle*********Closed
PRR Details
PRR #
1562
Title Configuration updates to the real time energy quantity pre-calc to add new WEIM pumped storage interval resource base schedule variable as an input to the settlement interval resource base schedule.
Date Submitted 3/20/2024 2:07 PM
PRR Category B
Priority Normal
Owner Ahmadi, Massih (CAISO)
Status Closed
Status End Date 6/13/2024 11:59 PM
Related BPM Settlements and Billing
BPM Section RT Energy Quantity PC v.5.25
RSS Subscribe
Existing Language

See BPMs attached to this PRR

Proposed Language

See BPMs attached to this PRR

Reason For Revision

A participant dispute uncovered an issue in which pumped storage hydro resources located in the WEIM balancing authority area were being incorrectly designated as generating resources during intervals in which those resources were pumping as loads, as indicated by those resources having a negative base schedule.  The configuration updates will ensure that a new input reflects pumped storage hydro resources in the WEIM balancing authority area as load resources when those resources are in pumping mode.

 

The BPM configuration guide RT Energy Quantity PC v.5.25 has been updated to reflect a revised formula for the Settlement Interval Resource Base Schedule charge type. The updated formula section also includes a new formula to define the new input: WEIM Pumped Storage Interval Resource Base Schedule.

 

The upstream changes are to be deployed around 5/1/2024.  The effective date of those changes will align to the BPM effective date of 3/1/2023.

Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Ahmadi, Massih (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

​Approve as submitted

Identification of the authorship of comments

No comments were received.
Action

Approve the BPM PRR as submitted

N/A
Statement of apparent requirements of the BPM PRR

This BPM PRR contains basic language changes.
Priority and rank for any BPM PRR requiring a CAISO system change

There are system changes associated with this PRR. The system changes are planned for implementation on 6/1/2024 on a normal basis.
Proposed effective date(s) of the BPM PRR

The ISO proposes an effective date of 3/1/2023 for the BPM revisions.
Other recommended actions

The ISO does not recommend any other actions on this BPM PRR.
Click here to view the Final Decision for this PRR
Final Decision

The ISO will adopt the BPM change as proposed in the recommendation.
Stakeholder Comment

No comments submitted.

Effective Date

3/1/2023
Action

Adopt the recommendation as originally issued

None
Announcements
No Announcements has been posted for this PRR.
Impact Analysis
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
No Recommendation Comments available for this PRR.
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.
Attachments