Update CG CC 6045 Over and Under Scheduling EIM Settlement to align the documentation with the current active settlement configuration.
This change is in sub business rules that did not align with the core business rule that was not included in the Configuration Guide but was present in the Settlements configuration(Effective date 1/1/2021) The business rule 11.1 to align with 11.0 from indicating a 25% to a 75% of hourly real time Load Aggregation Point (LAP) price, and business rule 12.2 to align with 12.0 to indicate the level 2 incremental price is applied for under scheduling, not over scheduling.
This document change only correction will be date back to the original version of the charge code, which do not result in no configuration or financial impact.