The California ISO's change management process facilitates the transparent exchange of ideas and information when the ISO considers modifications to its Business Practice Manuals (BPMs). Use​​ this site to submit and view Proposed Revision Requests (PRRs) and their statuses and to access the BPM library.

  • The purpose of BPMs is to set forth business practices that implement the ISO tariff. The ISO conducts a yearly policy initiative roadmap process to consider and rank initiatives.
  • Policy changes submitted though the PRR process will be referred to the policy initiative road map process. Each subject area in a BPM is based on enabling language in the ISO tariff.
  • The PRR process cannot be used to introduce changes that are not supported by existing tariff authority.​
    ​​​
PRR Title Filter
  • All the columns can be Sorted/Filtered except for the 'Comments' column.
  • Click on the PRR Number to view the complete details of the PRR.
  • To view the complete title mouse hover on the PRR Title field.
  • IC - Initial Comment, RC - Recommendation Comment

  • PRR
    PRR Title
    BPM
    Status
    Category
    Submitted By
    Priority
    Last Action
    Comments
    .........
    1573Clarifications to the CAISO AET Opt-in determination and Opt-in processEnergy Imbalance MarketInitial CommentAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1572Updated CC 4575 GMC Scheduling Coordinator ID Charge to clarify business rule charge code exclusionsSettlements and BillingInitial Stakeholder MeetingAAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1571Updating SUC MLC PC BPM documentation for Advisory shutdown flag for MLC qualificationSettlements and BillingInitial Stakeholder MeetingAAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1570Details on new process to establish Wheeling Through Priority as part of the TSMSP projectMarket OperationsInitial Stakeholder MeetingCMartin, Michael (CAISO)Emergency5/16/2024 IC: 0
    RC: 0
    1569Meter Data Submission MeteringInitial Stakeholder MeetingANamburi, Priyanka (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1568Clarifying tagging requirements in support of resource sufficiency evaluation Phase 2 ProjectMarket OperationsStakeholder Meeting on RecommendationAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 2
    1567Updates to constraints related to the impact of ancillary service awards on state of charge on storage resourcesMarket OperationsStakeholder Meeting on RecommendationAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1566Updating multiple BPMs for correct settlement of hybrid tie generator resourcesSettlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1565Update configuration guide for resource adequacy availability incentive mechanism pre-calc to resolve data overlap for the same resource on acquired rights and run of river resource adequacy availability incentive mechanism exemptionSettlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1564Updated real time congestion pre-calc 5.8 to accommodate a fix to show nodal congestion calculations.Settlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1563Created and updated multiple BPM configuration guides to exclude base schedule energy transfer system resource from being considered in assistance energy transfer calculations, and flags for corrections to resource sufficiency evaluations Pass/Fail scenarSettlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1562Configuration updates to the real time energy quantity pre-calc to add new WEIM pumped storage interval resource base schedule variable as an input to the settlement interval resource base schedule. Settlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1561Updated BPM Configuration guide real time net amount pre-calculation to accommodate market enhancement to ancillary services state of charge constraint.Settlements and BillingStakeholder Meeting on RecommendationBAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1560Updated BPM configuration guide for pre-calc configuration guide pre-calc wheel export quantity to accommodate transmission service and market scheduling priorities project phase 2Settlements and BillingStakeholder Meeting on RecommendationCAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1559Updating BPM existing transmission contract pre-calc transmission ownership right converted rights quantity business rule to support transmission exchange agreement initiativeSettlements and BillingStakeholder Meeting on RecommendationAAhmadi, Massih (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1558New OASIS report labeled ​ATC for PWT Requests Market InstrumentsStakeholder Meeting on RecommendationBMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1557Two minor updates related to multistage generators functionalityMarket OperationsClosedAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1556Clarification on hybrid dynamic limits submission requirementsMarket OperationsClosedAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1555Rules of Conduct Enhancements - Phase 1Rules of Conduct AdministrationClosedCStahl, Angelica (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1554Minor revision to Section 6.2 Estimated Aggregate Liability ComponentsCredit Management and Market ClearingClosedABilling, Christina (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1553Gen Model Data Requirements Real Reactive Capability Testing Process ClarificationTransmission Planning ProcessClosedARivera, Andrew (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1552Clarification on Number of Historical Days Used in the Mosaic Quantile RegressionMarket OperationsClosedAMartin, Michael (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1551Updating Definitions and Acronyms BPM Per Recent UpdatesDefinitions and AcronymsClosedAMeredith, Jacqueline (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1550Correction to Formatting and Links to Bring Change Management BPM CurrentBPM Change ManagementClosedAAyer, Ryan (CAISO)Normal5/16/2024 IC: 0
    RC: 0
    1549Clarification on Mosaic Quantile Regression use of historical dataMarket OperationsWithdrawnAMartin, Michael (CAISO)Normal2/23/2024 IC: 0
    RC: 0
    Total No. of Proposed Revision Requests = 1506