Proposed Revision Request Detail Help
PRR Life Cycle*******Final Decision**
PRR Details
PRR #
1679
Title Updates to battery point definitions
Date Submitted 5/29/2026 4:02 PM
PRR Category A
Priority Normal
Owner Namburi, Priyanka (CAISO)
Status Final Decision
Status End Date 8/18/2026 11:59 PM
Related BPM Direct Telemetry
BPM Section 14.5
RSS Subscribe
Existing Language

   Instantaneous State Of Charge (SOC)

The Instantaneous SOC is the amount of energy in MWh that the battery, in real time, has available for CAISO participation.  The SOC will be maintained within energy limit constraints (minimum and maximum) defined in the CAISO Master File.  Data should be updated every four seconds and should vary from zero to maximum energy limit. 

 Maximum Continuous Energy limit

The Maximum Continuous Energy Limit is the maximum energy in MWh that can be stored in the battery for CAISO participation. This value cannot be above the maximum energy limit defined in the CAISO Master File. The derate should be reflected, when applicable, in real time.​


Proposed Language

         Instantaneous State Of Charge (SOC)

The Instantaneous SOC is the amount of energy in MWh that the battery, in real time, has available for CAISO participation at the time this value is conveyed through telemetry. This value should be between the Minimum Continuous Energy Limit and Maximum Continuous Energy Limit as registered in the Master File, adjusted by any applicable outage, derate, or rerate.  The SOC will be maintained within energy limit constraints (minimum and maximum) defined in the CAISO Master File.  Data should be updated every four seconds and should vary from zero to maximum energy limit. 

            Maximum Continuous Energy limit

The Maximum Continuous Energy Limit is the maximum energy in MWh that can be stored in the battery for CAISO participation at the time this value is conveyed through telemetry. This value should align with what is registered in the Master File, adjusted by any applicable outage, derate, or rerate. This value cannot be above the maximum energy limit defined in the CAISO Master File. The derate should be reflected, when applicable, in real time.​

Reason For Revision

​Updates to battery point definitions​ to add clarity​ to the Instantaneous State Of Charge (SOC) and Maximum Continuous Energy limit.​ A new Telemetry point added – Minimum Continuous Energy Limit.​



Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Namburi, Priyanka (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

​Updating Battery point Definitions and a new point addition - Minimum Continuous energy limit​

Identification of the authorship of comments

Action

Approve the BPM PRR as submitted

Statement of apparent requirements of the BPM PRR

Priority and rank for any BPM PRR requiring a CAISO system change

Proposed effective date(s) of the BPM PRR

Other recommended actions

Click here to view the Final Decision for this PRR
Final Decision

Post the final as submitted.
Stakeholder Comment

N/A

Effective Date

8/7/2026
Action

Adopt the recommendation as originally issued

Announcements
No Announcements has been posted for this PRR.
Impact Analysis
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
2.  PG&E is concerned with some of the text in the impact document that says CAISO will require the telemetry of SOC to agree with the master file values, because some batteries are overbuilt. And if a battery is overbuilt then there will be times where the SOC does not agree with the master file’s max value.
 
CAISO Response: The Instantaneous SOC value should be between the Minimum Continuous Energy Limit and Maximum Continuous Energy Limit as registered in the Master File. Battery resources are expected to be operating within the master file limit.
 
3. Also, this isn’t directly related to PRR 1679, but in the BPM on Direct Telemetry, Table 6-1 says that batteries are required to provide their ramp rate as part of their telemetry requirements. We are unsure how we would measure that. Could CAISO provide some clarification on its expectations around this requirement?
 
CAISO Response: CAISO expectations on the ramp rate data for all resources is the same. Can you please send email to EDAS@caiso.com and provide more explanation on what issues are you running into while measuring the ramp rate for BESS resources?
7/30/2026 11:36 AM
Logged By - Williamson-Duffney, Joseph (CAISO)
CAISO has received the following comments from Alan Meck (Pacific Gas & Electric), 7/16/2026

1. Some of the text is garbled. For example, on p. 81, under Section 6.2 Analog and Digital Notes, #16 reads “HNote 1621es average wind speed.esources if there resource has a Battery component.SL”
2. PG&E is concerned with some of the text in the impact document that says CAISO will require the telemetry of SOC to agree with the master file values, because some batteries are overbuilt. And if a battery is overbuilt then there will be times where the SOC does not agree with the master file’s max value.
3. Also, this isn’t directly related to PRR 1679, but in the BPM on Direct Telemetry, Table 6-1 says that batteries are required to provide their ramp rate as part of their telemetry requirements. We are unsure how we would measure that. Could CAISO provide some clarification on its expectations around this requirement?
7/16/2026 2:47 PM
Logged By - Williamson-Duffney, Joseph (CAISO)
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.
Attachments