Proposed Revision Request Detail Help
PRR Life Cycle*********Closed
PRR Details
PRR #
1244
Title Updated BPM configuration guide for CC 6045 over and under scheduling EIM settlement to align the documentation with current active settlement configuration
Date Submitted 4/30/2020 11:25 AM
PRR Category A
Priority Normal
Owner Corona, Brenda (CAISO)
Status Closed
Status End Date 7/14/2020 11:59 PM
Related BPM Settlements and Billing
BPM Section CC 6045 Over and Under Scheduling EIM Settlement
RSS Subscribe
Existing Language
 
See BPM attached to this PRR
Proposed Language
 
See BPM attached to this PRR
Reason For Revision
 

Update CC 6045 Over and Under Scheduling EIM Settlement to align the documentation with the current active settlement configuration.

This change is in result of a pass through bill variable that was not included in the configuration guide but was present in Settlements configuration ( Effective date was 3/1/2017) .

CC 6045 Over and Under Scheduling EIM Settlement to include this variable in the documentation to maintain consistency with Settlements configuration.

The variable is already active in the system, and these are documentation only changes, which do not result in a configuration change
Click here to view the Recommendation Details for this PRR
BPM PRR Submitter

Corona, Brenda (CAISO)
Modified BPM language proposed by the PBM Chnage Management Coordinator

The ISO proposes no modified BPM language beyond that proposed in the BPM PRR.
Identification of the authorship of comments

No comments were received.
Action

Approve the BPM PRR as submitted

NA
Statement of apparent requirements of the BPM PRR

This BPM PRR contains basic language changes.
Priority and rank for any BPM PRR requiring a CAISO system change

There are no system changes associated with this PRR.
Proposed effective date(s) of the BPM PRR

The ISO proposes an effective date of 3/1/2017 for the BPM revisions.
Other recommended actions

The ISO does not recommend any other actions on this BPM PRR.
Click here to view the Final Decision for this PRR
Final Decision

The ISO will adopt the BPM change as proposed in the recommendation.
Stakeholder Comment

No comments submitted.

Effective Date

3/1/2017
Action

Adopt the recommendation as originally issued

None
Announcements
No Announcements has been posted for this PRR.
Impact Analysis
Impact Analysis Form.doc    
Notes:
Initial Comments
No Initial Comments available for this PRR.
Recommendation Comments
No Recommendation Comments available for this PRR.
Click here to view the Appeals for this PRR
Click on the '+' icon to submit a New Appeal

# of Appeals In Progress - 0
# of Appeals Closed - 0
# of Appeals Abandoned - 0
There are no Appeals on this PRR.
Attachments